Search

Yongming Cheng

from Houston, TX

Yongming Cheng Phones & Addresses

  • 11900 Wickchester Ln, Houston, TX 77043 (281) 589-2499
  • 20518 Walnut Canyon Dr, Katy, TX 77450 (281) 398-2880
  • Allston, MA
  • Kokomo, IN
  • Cambridge, MA
  • 20518 Walnut Canyon Dr, Katy, TX 77450

Work

Company: Keppel floatec Jul 2017 to Jul 2017 Position: Surf manager

Education

School / High School: Tsinghua University

Skills

Subsea • Oil&Gas • Drilling • Offshore • Pipelines • Upstream • Offshore Drilling • Oil/Gas • Subsea Engineering • Completion • Petroleum • Energy Industry • Epc • Engineering • Feed • Onshore • Project Engineering • Energy • Petroleum Engineering • Gas • Field Development • Fpso

Industries

Oil & Energy

Resumes

Resumes

Yongming Cheng Photo 1

Director

View page
Location:
16300 Katy Fwy, Houston, TX 77055
Industry:
Oil & Energy
Work:
Keppel Floatec Jul 2017 - Jul 2017
Surf Manager

Technip Feb 2001 - Jul 2011
Riser System Delivery Manager

Feb 2001 - Jul 2011
Director

Richtech International Engineering Feb 2001 - Jul 2011
Director - Riser Systems Engineering
Education:
Tsinghua University
Massachusetts Institute of Technology
Doctorates, Doctor of Philosophy, Engineering
Skills:
Subsea
Oil&Gas
Drilling
Offshore
Pipelines
Upstream
Offshore Drilling
Oil/Gas
Subsea Engineering
Completion
Petroleum
Energy Industry
Epc
Engineering
Feed
Onshore
Project Engineering
Energy
Petroleum Engineering
Gas
Field Development
Fpso

Publications

Us Patents

System And Method Of Utilizing Monitoring Data To Enhance Seafloor Sulfide Production For Deepwater Mining System

View page
US Patent:
20090284068, Nov 19, 2009
Filed:
Feb 13, 2009
Appl. No.:
12/371149
Inventors:
Chenteh Alan YU - Houston TX, US
Yongming CHENG - Houston TX, US
Assignee:
TECHNIP FRANCE - Courbevoie
International Classification:
E21C 50/00
US Classification:
299 19, 299 10
Abstract:
Applicants have created a method and system of deep sea mining comprising mining SMS deposits from the sea floor with a subsea miner, pumping the solids from the subsea miner through a jumper and pumping the solids from the jumper up a riser to a surface vessel. Further, applicants have created a method of deploying a deep sea mining system, comprising stacking a riser hangoff structure on top of a subsea pump module forming an assembly; picking up the assembly by a hanging mechanism, hanging the assembly on a moon pool, attaching a first riser joint; disconnecting the riser hangoff structure from the assembly; and attaching at least one second riser joint to form the riser.
Yongming Cheng from Houston, TX Get Report