Search

Joanne Maceo Phones & Addresses

  • 7667 Wickham Rd, Melbourne, FL 32940
  • Rockledge, FL
  • Ormond Beach, FL
  • New Smyrna Beach, FL
  • 1273 Little Oak Cir, Titusville, FL 32780 (321) 269-1678
  • Rockledge, FL

Work

Company: Ge transportation Jan 2009 Position: Senior program manager

Education

Degree: Bachelors, Bachelor of Science School / High School: University of South Florida Specialities: Electrical Engineering

Skills

Engineering Management • Systems Engineering • Integration • Six Sigma • System Design • Program Management • Engineering • Requirements Analysis • Cross Functional Team Leadership • Software Engineering • Earned Value Management • Aerospace • Product Management • Testing • Requirements Management • Automation • System Architecture • Software Design • Systems Design • Electronics • Embedded Systems • Electrical Engineering • Process Engineering

Industries

Transportation/Trucking/Railroad

Resumes

Resumes

Joanne Maceo Photo 1

Senior Program Manager

View page
Location:
25 Renee Ct, Rockledge, FL
Industry:
Transportation/Trucking/Railroad
Work:
Ge Transportation
Senior Program Manager

Ge Transportation Jan 2004 - Dec 2008
Senior Product Manager

Ge Transportation Apr 1998 - Apr 2004
Chief Systems Engineer and Engineering Manager

Nasa 1991 - 1998
Program Manager
Education:
University of South Florida
Bachelors, Bachelor of Science, Electrical Engineering
Skills:
Engineering Management
Systems Engineering
Integration
Six Sigma
System Design
Program Management
Engineering
Requirements Analysis
Cross Functional Team Leadership
Software Engineering
Earned Value Management
Aerospace
Product Management
Testing
Requirements Management
Automation
System Architecture
Software Design
Systems Design
Electronics
Embedded Systems
Electrical Engineering
Process Engineering

Publications

Us Patents

System And Method For Railyard Planning

View page
US Patent:
7813846, Oct 12, 2010
Filed:
Mar 14, 2006
Appl. No.:
11/374012
Inventors:
Mitchell Scott Wills - Melbourne FL, US
Srinivas Bollapragada - Niskayuna NY, US
Joanne Maceo - Rockledge FL, US
Prescott H. Logan - Satellite Beach FL, US
Assignee:
General Electric Company - Schenectady NY
International Classification:
G06F 7/00
G06F 17/00
B61B 1/00
B61L 27/00
US Classification:
701 19, 701117, 246 2 R, 104 261
Abstract:
A system and method for generating a computer-aided rail yard plan for the movement of plural railcars through a rail yard, the rail yard having tracks that are used as receiving tracks, classification tracks and departure tracks and the plural railcars arriving on inbound trains and departing on outbound trains, the plural railcars required to undergo a sequence of tasks to move through the rail yard, the yard plan providing (a) a schedule for receiving trains, (b) a schedule for inspecting cars on receiving tracks, (c) a schedule for humping cars from receiving tracks into classification tracks, (d) a schedule for pulling trains onto departure tracks, (e) a schedule for testing trains, and (f) a schedule for departing trains.

Method And Apparatus For Coordinating Railway Line Of Road And Yard Planners

View page
US Patent:
7937193, May 3, 2011
Filed:
Jan 31, 2006
Appl. No.:
11/342853
Inventors:
Joseph Wesley Philp - Indialantic FL, US
Mitchell Scott Wills - Melbourne FL, US
Joanne Maceo - Rockledge FL, US
Assignee:
General Electric Company - Schenectady NY
International Classification:
B61L 27/04
B61L 17/00
B61L 23/00
G06F 17/00
US Classification:
701 19, 701117, 701200, 246 2 R, 246 6, 246 97
Abstract:
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system. Similar movement planners exist for moving trains in yards or terminals. Coordination is achieved and system efficiency improved by interfacing the line of road and yard planners.

System And Method For Dispatching By Exception

View page
US Patent:
8380373, Feb 19, 2013
Filed:
May 28, 2008
Appl. No.:
12/153948
Inventors:
Paul M. Julich - Indialantic FL, US
Mitchell Scott Wills - Melbourne FL, US
Joanne Maceo - Rockledge FL, US
Joseph Wesley Philp - Indialantic FL, US
Brian Smith - Melbourne FL, US
Christopher P. Roney - Melbourne FL, US
Assignee:
General Electric Company - Schenectady NY
International Classification:
B61L 27/04
G06F 17/00
B61L 27/00
US Classification:
701 19, 701117, 246167 R
Abstract:
A system and method for controlling the movement of plural trains over a rail network, where the rail network is divided into at least one control area with a dispatcher assigned to manage the movement of trains in a control area by predicting the occurrence of events along the network based on the movement plan and prompting the dispatcher to provide information or take specified actions relating to the predicted events.

Method Of Planning The Movement Of Trains Using Route Protection

View page
US Patent:
8498762, Jul 30, 2013
Filed:
May 2, 2006
Appl. No.:
11/415272
Inventors:
Mitchell Scott Wills - Melbourne FL, US
Joanne Maceo - Rockledge FL, US
Randall Markley - Melbourne FL, US
Joel Kickbusch - Rockledge FL, US
Erdem Telatar - Palm Bay FL, US
Assignee:
General Electric Company - Schenectady NY
International Classification:
G08G 1/00
US Classification:
701 19, 701117, 340928
Abstract:
A method of planning the movement of plural trains over a train network utilizing route protection for the route immediately ahead of a train to avoid undesirable changes to the planned route of the train.

System And Method For Dispatching By Exception

View page
US Patent:
20040172175, Sep 2, 2004
Filed:
Feb 25, 2004
Appl. No.:
10/785059
Inventors:
Paul Julich - Indialantic FL, US
Mitchell Wills - Melbourne FL, US
Joanne Maceo - Rockledge FL, US
Joseph Philp - Indialantic FL, US
Brian Smith - Melbourne FL, US
Christopher Roney - Melbourne FL, US
International Classification:
G06F017/00
US Classification:
701/019000, 246/00200R
Abstract:
A system and method for controlling the movement of plural trains over a rail network, where the rail network is divided into at least one control area with a dispatcher assigned to manage the movement of trains in a control area by predicting the occurrence of events along the network based on the movement plan and prompting the dispatcher to provide information or take specified actions relating to the predicted events.

Method And Apparatus For Estimating Train Location

View page
US Patent:
20060212183, Sep 21, 2006
Filed:
Jan 31, 2006
Appl. No.:
11/342816
Inventors:
Mitchell Wills - Melbourne FL, US
Brian Smith - Melbourne FL, US
Joanne Maceo - Rockledge FL, US
Randall Markley - Melbourne FL, US
International Classification:
G01C 21/00
US Classification:
701019000, 701200000
Abstract:
A scheduling system and method for moving plural objects through a system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system. The estimation of the location of trains in track warranty locations where track sensor and GPS indications are not available is made based on the movement planners and the form-based movement authorities issued to each trains. Certain user interactions are interpreted as a specific train location.

Method And Apparatus For Scheduling Maintenance Of Way

View page
US Patent:
20060212186, Sep 21, 2006
Filed:
Jan 31, 2006
Appl. No.:
11/342855
Inventors:
Joseph Philp - Indialantic FL, US
Mitchell Wills - Melbourne FL, US
Joanne Maceo - Rockledge FL, US
International Classification:
G01C 21/00
US Classification:
701019000, 701200000
Abstract:
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system, and is particularly useful in optimizing the value of trains moved against the penalty for postponement of maintenance of the right of way.

Scheduler And Method For Managing Unpredictable Local Trains

View page
US Patent:
20060212187, Sep 21, 2006
Filed:
Jan 31, 2006
Appl. No.:
11/342856
Inventors:
Mitchell Wills - Melbourne FL, US
Joseph Philp - Indialantic FL, US
Joanne Maceo - Rockledge FL, US
Joel Kickbusch - Rockledge FL, US
International Classification:
G01C 21/00
US Classification:
701019000, 701200000
Abstract:
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system, and is particularly useful in managing the unpredictable movement of local industry trains.
Joanne M Maceo from Rockledge, FL, age ~61 Get Report